Description
To be renamed ‘Pacific Pier' the existing sea lion exhibit is to be totally refit to match its new themeing concept. With a very short construction period of 240 days, scope of works includes replacing all the deteriating fibre glass rockwork and underwater vision panels, constructing a new concrete lighthouse feature with three nos. of holding tanks, refiting the interior and the exterior of the 3 storeys gallery, installing and commissioning a new sea water filtration system etc..